PPAP: Production Part Approval Process
PPAP Production Part Approval Process Comply With Design Specifications
Quality Control Dimensional Inspection Report Process Capability Studies
Touchstone Measurement Service works extensively in the corporate industrial environment and is
fully versed and experienced in PPAP, the Production Part Approval Process.
- Required by many automobile manufacturers and other large industries, for outside parts manufacturers and suppliers
- PPAP must be completed, submitted and approved before production begins
- Ensures suppliers comply with design specifications
PPAP helps improve quality control and ensures that you will achieve,
and lower the cost of, the quality you demand.
PPAP: A Brief Explanation of the Process
PPAP is a set of specific requirements from the manufacturer, that must
be met before any work can begin. The complex process must be strictly
followed before approval will be given.
Oversight is conducted by Eikenberry and Associates' Quality Control Department,
utilizing the resources of all our affiliates.
During the approval process we can provide any or all of the following
information, as requested:
- Material Certifications
- Material Flow-Chart
- Dimensional Inspection Report – layout of all parts for verification of
specifications before production
- Failure Mode Effects Analysis (FMEA)
-
Process Capability Studies conducted by Touchstone
- Parts Inspection –
conducted by Touchstone to verify all dimensional specifications of
finished parts